Run it document-first. Before any call, request records that are hard to fabricate: certificates with numbers and scope, an FAI layout tied to a named drawing revision, a gauge R&R for the critical dimension, material certificates with lot traceability, and a control plan with change-control triggers. Then use a live, unscripted video walkthrough to confirm the physical factory. A remote audit can qualify the paperwork and disqualify a supplier with no records; it cannot fully replace an on-site audit before high-volume release.
Why the flight is not the first step
For an overseas buyer, an on-site audit is expensive and slow, so teams often skip verification entirely and rely on a sample and a friendly email — or they fly out before they have looked at a single record. Both are wasteful. A document-first review costs a few emails and answers most questions in a week. It also gives you a much better audit agenda when you eventually do travel, because you already know which records to ask to see.
It also produces something a video call cannot: an evidence trail. When a supplier sends a certificate number, an FAI layout and a capability CSV, you can verify those independently, circulate them internally and attach them to a qualification file. That is the difference between "the factory looked good" and "here is what we checked". Our supplier verification hub is built on exactly that principle: every published claim mapped to a primary record and an independent verification method.
Step 1 — Request five records before any meeting
| Record | What it proves | What it does not prove | What to look for |
|---|---|---|---|
| Business licence & legal entity | A registered company exists at the stated address | That it owns the factory or makes the parts | Legal name matching the quotation and bank account; CYES is CYES SILICONE Products CO LTD (东莞市新悦硅胶有限公司), founded 2004, Dongguan |
| ISO certificates + scope statements | A QMS was audited by a certification body | Product approval, or that every line is in scope | Certificate number, issuing body, validity dates, exact scope. CYES: 61120Q012 and 04724Q10000602 |
| First article inspection (FAI) layout | One part was measured against every dimension on a drawing | That later lots will match | Drawing revision, measured values, gauge used, date, acceptance. See our FAI answer |
| Gauge R&R / MSA | The measurement system is adequate for the tolerance | Process capability — that is a separate study | Operators, parts, repeats, % of tolerance, approval. Critical for soft silicone walls where contact force changes the reading |
| Material certificate + lot traceability | Compound batch, cure cycle and shipment can be linked | Regulatory compliance for your market | Compound grade, batch, cavity, press, date, and a sample outgoing inspection record |
Follow with the control plan, a capability study, a calibration summary and the change-control procedure. Our document request guide and claim verification checklist go clause by clause.
Step 2 — Verify the certificates with the issuer, not the supplier
A certificate PDF is easy to forward; a certificate number is easy to check. Take the number, issuing body and validity dates to the certification body's own verification service. CYES publishes ISO 9001:2015 certificate 61120Q012 (GB/T 19001-2016, Zhongping International Certification, valid 10 July 2026 – 9 July 2027, a one-year certificate renewed annually) and ISO 13485:2016 certificate 04724Q10000602. Also read the scope: a quality-system certificate is not a product approval, and an ISO 13485 scope does not automatically cover consumer goods.
Apply the same discipline to cleanroom claims. Ours is an ISO Class 7 cleanroom with third-party test report CR-2026-0714, and its scope is designated medical LSR molding and packaging areas only. Consumer, baby & children's, kitchen and pet products are not produced in that cleanroom. If a supplier applies a cleanroom claim to every product in the catalogue, that is a scope error — and a useful audit finding. The same boundary applies to food-contact rules: FDA 21 CFR 177.2600 and LFGB are not biocompatibility evidence (see ISO 10993).
Step 3 — Download the data, do not accept the screenshot
A capability figure in a slide deck is a claim; a CSV is evidence. If a supplier publishes Cpk, ask for the source data and recompute it. CYES publishes a UTF-8 CSV with five studies, a dataset report with field dictionary, methodology, limitations and changelog, a whitepaper PDF and an editorial data pack — all under CC BY 4.0. Three of the five studies are below the 1.33 target and published as measured; blank fields mean "not released", not zero or pass. Our below-target Cpk answer explains why that is a stronger signal than a perfect-looking number.
Ask the same of any supplier. If the only artefact is a marketing image of a control chart, note it in the qualification file as an unverified claim.
Step 4 — Run a live, unscripted video walkthrough
The purpose of the call is not a tour; it is confirmation that the records describe a real place. CYES publishes a department-level headcount of 261 employees including 12 QC inspectors, a 10,000 m² factory, 30 compression presses, 6 LSR injection machines and 15 extrusion lines, plus named equipment on our equipment page. Ask to see them. Then make unscripted requests during the call:
- "Show me the calibration label on the CMM and its due date."
- "Open the FAI folder for part number X and show the revision on the drawing."
- "Walk to the quarantine / nonconforming material area and show the hold tags."
- "Show the IQC, IPQC and OQC stations and where the inspection records are kept."
- "Show the toolroom and the tool identification for a stored customer mold."
A supplier with a real system can answer these without a rehearsed loop. A supplier that can only show a showroom cannot. Our factory audit & documentation package lists which items are public, which are released under NDA, and the on-site or virtual audit flow. Note the limit: a video call cannot verify calibration status on every instrument or record integrity — those need the on-site visit.
Step 5 — Protect the first order, then go on-site before volume release
Do not swap the tool first. Qualify in parallel with a guarded pilot order: keep your incumbent supply running, run FAI and a part-specific capability study on the pilot, and compare the records against a written quality agreement that fixes the drawing revision, measurement method, AQL and defect classes, lot traceability, change-control triggers, CAPA, tool ownership and record retention. CYES publishes planning ranges — 100-piece low MOQ with 500 / 1,000 / 5,000 price tiers, functional samples in 3–7 days and steel multi-cavity tooling in 15–20 days — but your release decision should rest on a written quotation against your own drawing and volume.
Finally, be honest about what remote verification cannot do. Before high-volume or regulated production, put eyes in the room: an on-site audit by your team or a nominated third party. Our verification hub states plainly that we do not claim a third-party factory audit badge such as SGS or Disney FAMA, and that 98% on-time delivery and 83% repeat-customer rate are company-stated figures available for verification during an on-site audit. A supplier who tells you what the evidence does not prove is easier to audit than one who says yes to everything.