Short answer

A First Article Inspection (FAI) is a full dimensional layout of one or more first-off parts against the drawing — every dimension measured and recorded before production starts. It proves the tool actually produces the part on the print. It is not the same as PPAP, which adds process documentation, control plans and capability studies.

First article inspection flowMeasure the first sample against every drawing dimension.drawing (2D)measure sampledim vs specreportEvery dimension on the drawing is measured and recorded.approve → mass productionFAI is the gateway that proves the tool can make the part.
FAI measures the first production sample against every drawing dimension — the proof the tool and process can make the part.

What an FAI contains

  • Full dimensional layout: every dimension on the drawing, measured and recorded with actual vs nominal.
  • Material verification: compound, hardness and any specified tests.
  • Visual and cosmetic check against the approved sample.

FAI vs PPAP

FAI answers "does the tool make the part on the print?" PPAP answers "is the whole process stable, documented and ready to run?" — it adds a control plan, process flow, capability studies (Cpk) and measurement system analysis. Medical and automotive programs typically require PPAP-level documentation; consumer products usually start with an FAI and add capability data on critical dimensions.

CYES provides a documented FAI report (we publish a desensitized FAI example in our quality documents) and can extend it to PPAP-style documentation with Cpk studies where the program calls for it.