Short answer

A working quality agreement for silicone parts names the drawing revision and critical dimensions, fixes the measurement system before the tolerance, defines outgoing inspection and defect classes, sets lot traceability and record retention, lists change-control triggers, and says how nonconformance, tooling ownership and subcontracting are handled. Every clause should end with a named record, an owner and a trigger — not a promise to "ensure quality".

Nine core clauses of a silicone part quality agreementA three-by-three grid covering drawing revision, measurement, AQL, traceability, change control, nonconformance, tooling, subcontracting and records.A quality agreement, clause by clausedrawing revisiongauge R&RAQL outgoinglot traceabilitychange / ECNnonconformancetooling & IPsubcontractingrecord retention
Nine clauses that turn a quality policy into an enforceable agreement for molded and LSR silicone parts.

A quality agreement is not a certificate and it is not a purchase order. It is the document that decides in advance how two companies will answer the question "is this part good?" when they disagree — and sooner or later they will. For molded and LSR silicone the disagreement is rarely about a single number. It is about which revision of the drawing controls, how a soft wall was measured, who defined a cosmetic defect, and whether the tool that made the first article is the tool making the thousandth. The clauses below are the ones that actually prevent disputes. Each should end with a named record, a named owner and a named trigger; a clause that ends with "the supplier shall ensure quality" is decoration.

1. Drawing revision and critical dimensions

Begin by naming the controlling document: part number, drawing revision, and the date from which that revision is effective. Attach the revision rather than describing it. Agreements often fail because the buyer's engineering file and the supplier's shop-floor print are at different revisions, and nobody notices until a shipment is rejected. State the rule plainly — the revision listed in the agreement governs, and any superseding revision enters only through the change-control clause.

Next split dimensions into critical, functional and general. A critical dimension is one where an out-of-tolerance part will not fit, will not seal, or will fail a safety or regulatory function; it deserves a defined tolerance, a defined gauge and a defined frequency. General dimensions can sit under a standard tolerance table such as ISO 3302-1 for rubber. The clause must name which dimensions on this specific part are critical — importing a generic tolerance table and calling it a control plan is not enough. On steel multi-cavity tools, CYES holds mold cavities to ±0.008 mm on MAKINO CNC equipment; that is the realistic basis for a critical-dimension commitment, not a marketing range. Where a dimension is truly safety-relevant, the agreement should also state that a capability study, not just a passing inspection, is required at release.

Material compliance must match intended use, and the agreement should say which framework applies. FDA 21 CFR 177.2600 and LFGB §30/31 are food-contact rules. Skin-contact or biological-contact claims belong under ISO 10993 or USP Class VI. Do not copy a food-contact sentence into a medical device agreement and treat it as biocompatibility — the two answer different questions, and mixing them is a common way to invalidate an otherwise sound file.

2. Measurement method and gauge R&R

This is the clause most agreements underwrite and the one most disputes are actually about. Silicone is soft: a caliper reading across a flexible wall depends on the contact force, the operator, the orientation and how long the part has been conditioned after demold. A tolerance written without a measurement system is an aspiration, and two competent inspectors can disagree about it indefinitely. Define the gauge and its resolution, the fixture that locates the part, the number of readings and how they are averaged, the conditioning time and temperature, and the environment for dimensional inspection.

Then add measurement system analysis. For a critical dimension, require a gauge repeatability and reproducibility study (gauge R&R) before the tolerance is used for acceptance — commonly, less than 10% of tolerance is acceptable, 10–30% may be acceptable with customer agreement, and above 30% is not. The agreement should state which thresholds apply, how many operators and parts the study uses, and who approves the result. A control plan that lists a Cpk target without an MSA behind it is measuring the operator as much as the part. On medical LSR programmes, where a diaphragm dimension may run at Cpk 1.24, the measurement method is part of the validated system and belongs in the agreement, not in a footnote.

3. Outgoing inspection and AQL

The acceptance-sampling clause needs four elements, not one. Name the standard — ISO 2859-1 or an agreed equivalent — name the inspection level (general level II is the common starting point), name the AQL for each defect class, and attach a written inspection specification that defines what counts as a critical, major or minor defect for this part number. A bare "AQL 1.0" with no standard, no level and no defect definitions is not enforceable because nobody can reconstruct the sampling plan from it. Add approved boundary samples where appearance matters: the same flash line on a sealing face and on a hidden edge are different findings, and boundary samples settle that before production rather than after a rejected lot.

State the limit of the method too. Acceptance sampling controls the risk of accepting a bad lot; it does not certify every part in the lot. If the programme needs part-by-part evidence, the agreement must say so and name the record that provides it — a dimensional layout, a leak-test trace or a serialized result. For low-volume prototype orders, a 100% dimensional check is often more economical than an AQL plan, and the clause should allow that path rather than forcing a sampling scheme onto 100 pieces. With a 100-piece minimum order and price tiers at 500, 1,000 and 5,000, CYES routinely runs both styles, and the agreement can name which applies at each volume band.

4. Traceability and lot records

Define what a "lot" is before asking for lot records. For silicone, a useful definition ties together the compound batch, the mold and cavity, the cure or post-cure cycle, the press or line, and the production date or shift. The agreement should require that each shipment can be traced back through those elements and forward to the customer's receiving record. On request, that means a material certificate for the compound, a production or device history record, an in-process and outgoing inspection record, and a packing or dispatch list that links cartons to lot numbers. For medical LSR programmes this is a regulatory expectation, not a courtesy; for general industrial parts it is still the fastest way to contain a problem when one appears.

Be precise about the environment clause as well. Where a medical LSR or high-purity part is involved, name the controlled environment and the evidence behind it: CYES operates an ISO Class 7 cleanroom with third-party report CR-2026-0714, used for designated medical LSR molding and packaging. Consumer and baby or children's products are not produced in that cleanroom and should never be described as if they were — writing that into an agreement would misstate the process and mislead an auditor. Keep the claim tied to the parts it actually covers.

5. Change control (ECN)

Engineering changes after release are the single largest reason a quality agreement quietly goes out of date. Write a trigger list, not a general obligation. Triggers should include drawing revision; compound supplier, grade or colour master; hardness; cavity and shut-off faces; gate and vent geometry; cure and post-cure cycle; press assignment; packaging; and inspection method. For each trigger, state whether it requires written approval, a new first article inspection, a capability re-study, or a combination. "The supplier will notify the customer of changes" leaves every one of those open to interpretation.

Anchor the clause in real lead time. A functional sample takes 3–7 days and a steel multi-cavity tool takes 15–20 days, so a cavity change is not a same-day event and an agreement that assumes it is will be rewritten by reality. The clause should also state what happens between notification and approval: does the supplier hold existing stock, continue shipping to the old revision, or segregate? CYES responds to engineering questions within 24 hours, and the change-control clause should use that response window as the starting point for acknowledgement, while making clear that validation time is additional. On medical programmes, add the regulatory dimension — a change that affects a validated process may require notification or reassessment before shipment.

6. Nonconformance and CAPA

Say exactly what happens when a lot fails. Who is notified and within how many hours; how the suspect material is contained and identified; whether a concession or deviation needs written customer sign-off; and what evidence accompanies the disposition. Containment should be physical, not verbal — segregated stock, a hold tag and a documented count. A supplier that ships a "minor" deviation without a signed concession has converted a quality clause into a commercial dispute.

Then require corrective action with a closed loop. A nonconformance report should record the problem, the immediate containment, a root-cause analysis (5-why or fishbone), the corrective action, an owner and a due date, and a verification of effectiveness after the action is implemented. The agreement should state that CAPA is not closed by writing the word "closed" — it closes when a subsequent lot or a defined number of subsequent lots confirms the cause is gone. Repeat defects should escalate, and the clause should say who owns that escalation. This is where an ISO 9001 or ISO 13485 quality system becomes visible: CYES holds ISO 9001:2015 certificate 61120Q012 and ISO 13485:2016 certificate 04724Q10000602, and the CAPA clause is where those systems are expected to show their records, not their logos.

7. Tool ownership and IP

Paid tooling has to be unambiguous. State who pays, who holds title, where the tool is stored, who maintains it, and what happens at end of programme. Ambiguity here is expensive: a customer who assumes they own the mold discovers, too late, that the supplier treats it as an asset. State that paid tooling becomes the customer's property, that it is identified with the customer's part number, and that it will not be used for another customer. The agreement should also cover access and transfer — the right to inspect the tool, to receive maintenance records, and to move the tool to another molder with reasonable notice.

Design IP is a separate sentence. On CYES programmes, the customer pays for the tool and the tooling IP belongs to the customer; we are NDA-friendly and do not claim ownership of customer designs. The clause should make that explicit and should prohibit reverse engineering, copying of cavities, or reuse of approved samples beyond the agreed programme. Where CYES engineering contributes original design work, say who owns that contribution and on what terms it may be reused — clarity at the start avoids an argument after a successful launch.

8. Subcontracting

Agreements often bind the supplier while ignoring the supplier's own suppliers. Add a clause that requires disclosure of any subcontracted operation — secondary curing, printing, assembly, plating or packaging — and states which operations are approved in advance. The supplier must flow the relevant requirements down: the drawing revision, the critical dimensions, the inspection specification, the traceability and retention obligations. The customer should retain a right to audit or to be notified of a change of subcontractor, and the supplier should remain fully responsible for the subcontractor's nonconformance. "It was our vendor's fault" is not a disposition.

Be honest about capability boundaries here. CYES runs its own 10,000 m² factory with 261 employees, founded in 2004, with in-house mold making, compression molding, LSR injection, extrusion and overmolding. Where an operation is genuinely outside that scope, the agreement should name it and set the rules rather than assume everything is in-house — a document that assigns responsibilities to the wrong party is harder to enforce than one that states the boundary. The same principle applies to third-party testing: name who nominates the laboratory and who pays when a drawing requires CMM, blue-light scanning or material analysis.

9. Record retention and how CYES backs these clauses

Finally, state which records are kept, for how long, in what form, and who may access them. A practical list includes the controlled drawing and revision history, the control plan, FAI layouts, gauge R&R and capability studies, material certificates, lot and device history records, inspection and test results, nonconformance and CAPA files, and change-control approvals. Retention periods should reflect the product: medical device records typically follow regulatory expectations and are longer than general industrial ones. Say whether records are paper or electronic, how quickly they can be retrieved, and how confidentiality is preserved. A clause that says "records shall be retained" without a period or a retrieval commitment is untestable.

CYES publishes measured, not generic, figures behind these commitments: Cpk 1.24–1.68 across documented studies with a medical LSR diaphragm at 1.24; mold cavities at ±0.008 mm on MAKINO CNC; functional samples in 3–7 days and steel multi-cavity tooling in 15–20 days; and an ISO Class 7 cleanroom report CR-2026-0714 for designated medical LSR molding and packaging. Operationally, a 100-piece minimum order with 500/1,000/5,000 price tiers, a 24-hour engineer response, an 83% repeat-order rate and 98% on-time delivery give the agreement something real to stand on. Send us your draft clauses and we will mark which ones are backed by published evidence, which are agreed per programme, and which need a named measurement system before they mean anything.