Short answer

The questions a supplier is most reluctant to answer are the ones that matter most. Ask about the customer list, the real MOQ math, the missing audit, the mold ownership, and whether it takes retail orders — and listen for an answer that is direct, specific, and occasionally uncomfortable. A factory that can answer these honestly is almost certainly a factory worth visiting.

Why the uncomfortable questions are the ones that matter

Every procurement team starts with the same polite list: lead time, price, certifications. Those are table stakes, and every supplier — factory or trading company — has a polished answer for them. The gap between a real factory and a reseller with a good website shows up only when you ask the questions a reseller cannot answer well: who exactly are your customers, why is your MOQ what it is, and may I come see the floor tomorrow.

This page lists ten of those questions. For each one, we also show what an honest answer sounds like — because the best way to judge a supplier is not the question, but the texture of the reply. A vague answer to a specific question is itself an answer.

Ten questions to ask — and the honest answer to listen for

1. "Who are your customers?"

A serious OEM factory will not hand you a named brand list, because most of its programs sit under NDA. The honest answer is a substitute: certificate numbers, third-party lab reports, and an invitation to audit the floor yourself. A supplier that eagerly name-drops big brands is usually trading on someone else's credibility — and a supplier that refuses to give you anything verifiable is hiding a thin history. What you can verify at CYES is the certificate number, not a story — see our published evidence.

2. "Are you a factory or a trading company?"

The honest answer comes in three verifiable pieces: the address on the ISO certificate matches the shipping address, the tooling is cut in-house, and you can get a live walkthrough on short notice. A trader can forward certificates; it cannot show you presses, mold CNC, and post-cure ovens running on one floor. We publish the factory facts — 10,000 m², 261 people, 20+ years — on why buyers choose CYES, and we host customer audits on the floor.

3. "Why is your MOQ higher than the MOQ 100 someone else advertised?"

An honest factory explains the math instead of cutting the number to please you. A real MOQ is the volume at which a dedicated hardened-steel mold, a dedicated press cycle, and per-batch compliance testing amortize without running at a loss. An advertised "MOQ 100" usually means order consolidation across buyers, tooling cost buried in a 2–3× unit markup, or a soft prototype mold that degrades after a few hundred cycles. The full economics are in our MOQ guide and mold cost drivers.

4. "You don't have an SGS / Disney FAMA / Sedex audit — should that disqualify you?"

The honest answer is: a generic third-party audit is a one-time snapshot, while a customer's own audit is more rigorous — and most retail programs end up requiring the brand's audit anyway. What you should ask for instead is ISO 9001/13485 documentation, per-batch FDA and LFGB reports, batch traceability, and on-demand audit access. If a program requires FAMA or Sedex, that is a customer-specific cost built into the quote — not a badge to display. See what we actually hold.

5. "Do you take retail or personal-use orders?"

A factory dedicated to B2B custom OEM/ODM will politely say no — its entire floor is built around tooled, retail-brand quantities. If a supplier is equally happy selling one piece and ten thousand, it is a retailer, not a factory. We decline personal orders as a matter of focus; it is the same focus that keeps a program's engineering review consistent from CAD to carton.

6. "Can we audit your factory — and how fast?"

The honest answer gives you a date, not a deflection. In-person audits on a week's notice, or a virtual walkthrough within 24 hours, are the standard you should hold for. A supplier that needs "a few weeks to arrange" or asks you to sign an NDA before showing you the floor is telling you something. See our factory tour and the evidence in engineering evidence.

7. "Who owns the molds after production starts?"

On a documented OEM program the molds are yours, stored on customer-segregated racks under a program code, and transferable on written request. This belongs in the program agreement before the first article — and the supplier should state plainly that it never quotes another buyer using your tooling. Tooling terms are covered in tooling payment terms and mold life & shot count.

8. "What is your monthly capacity?"

An honest supplier says "it depends on the SKU" and shows you how the number is derived — cycle time, cavity count, post-cure schedule — instead of quoting one impressive headline figure. A single capacity number with no context is marketing. The inputs that decide it are in how many cavities.

9. "What is your on-time delivery rate — and can you prove it?"

"98%" without a measurement is a slogan. The honest answer points at the system behind it: a measured on-time rate, a published process-capability study, and a first-article inspection that catches drift before it ships. CYES publishes its measured Cpk (1.24–1.68) and on-time rate rather than asserting them — the method is in Cpk on a dimension and first article inspection.

10. "Why is your quote higher than the other one?"

An honest supplier breaks the price into its parts — mold, material, post-cure, QC, decoration — so you can see what you are comparing. A quote that is 30% lower is usually not the same thing with a discount; it is a cheaper mold steel, a skipped post-cure, or a batch with no compliance testing. The cost structure is in part cost per unit.

What an honest supplier sounds like

Read the ten answers above again and a pattern appears. An honest supplier is specific (certificate numbers, not logos), direct about trade-offs (why the MOQ is what it is, why the price is higher), and happy to be audited (a date, not a deflection). It will also decline the business that does not fit — a retail order, a spec it cannot hold — which is exactly the behaviour that keeps the work it does take on schedule. The supplier that says yes to everything is the one to worry about.

How CYES answers them

We wrote this page because these are the questions we actually get — and we answer them the same way every time: with the record, not the reassurance. CYES is a factory, not a trader — ISO 13485:2016 (certificate no. 04724Q10000602) and ISO 9001, an in-house ISO Class 7 cleanroom (report CR-2026-0714), 10,000 m² under one roof in Dongguan, 261 people, and a measured on-time rate of 98%. When a buyer asks the hard questions, our answer is the same invitation: come audit the floor, or take a 24-hour virtual walkthrough, and read the records yourself.