Short answer

Test in two steps before cutting steel: first validate the design with a soft (aluminum) tool or rapid silicone sample, then validate the process with a single-cavity steel tool. Cutting a multi-cavity steel tool straight from a CAD file is the most expensive mistake in silicone development.

Test before cutting steelChecklist that de-risks tooling.Prove these before you commit to steelgeometry / fithardnesstear / tensilecompression setcompliancebond (overmold)Changes are cheap before steel; expensive after.
Verify geometry, hardness, tear, compression set, compliance and bond on a prototype before cutting production steel.

The two-layer validation

  1. Design validation (soft tool / rapid sample): confirm geometry, fit, hardness, color and feel cheaply.
  2. Process validation (single-cavity steel): confirm the actual LSR or compression parameters, tolerance and defect profile.

Why the process step matters

A soft tool proves the part looks and feels right, but it does not reproduce production conditions — LSR injection pressure, cold-runner balance and cure profile only appear on a real steel tool. That is why we run a T1/T2/T3 trial sequence on the production tool before signing off. The soft tool de-risks the design; the single-cavity steel tool de-risks the process.

This staged route costs more in tooling steps but almost always saves money overall, because it catches problems when a fix costs hundreds of dollars instead of tens of thousands.