Short answer

Soft (aluminum) tooling is cheap and fast — good for prototypes and runs up to tens of thousands of shots — but it wears, so tolerance and surface finish drift. Hardened steel (S136/NAK80/P20) costs more up front but holds tolerance for hundreds of thousands to a million-plus shots. Use soft tooling to validate the part, then cut steel for production.

Soft tool vs steelCheap short-run soft mold against long-life production steel.Soft / prototypeProduction steel300–500 shots100k–1M+ shotslow costhigher tool costfast to cutlonger buildpilot / validatemass productionaluminum / softP20 / NAK80 / S136Prototype cheap first, then cut steel once the part is proven.
A soft mold validates the part cheaply; production steel runs the volume. Spend on steel only after the design is proven.

The real trade-off

AttributeAluminum (soft)Steel (hardened)
Cost (single cavity)$300–$1,500$1,000–$10,000+
Lifespan5,000–50,000 shots500,000–1,000,000+ shots
Tolerance driftNoticeableMinimal
Best forPrototypes, short runsProduction

The staged approach

The cheapest way to de-risk a new part is a three-step route: prototype (SLA or a soft tool) to confirm fit and function, then a single-cavity production steel tool to confirm the process, then a multi-cavity tool once volumes are proven. Jumping straight to a multi-cavity steel tool on an unproven design is the most expensive mistake we see.

One caveat: an LSR part’s process parameters (temperature, injection pressure, cold-runner balance) do not transfer perfectly from an aluminum prototype tool to production steel, so the production tool still needs a T1/T2 trial. Soft tooling de-risks the design, not the process.