Short answer

Prototype by stage, not by a single method: an SLA print proves form in 1–3 days, a rapid silicone sample (from a soft tool or vacuum casting) proves material and feel in 3–7 days, and a single-cavity mold proves the molding process in 7–15 days. Each stage answers a different question, so the cheapest route depends on what you are trying to de-risk.

Prototype route by stagePick the fastest route for the stage you are at.concept3D printform checkprint / SLAfunctionsoft moldpilotsteelCheap and fast first; steel last, once the part is proven.3D print → soft mold → pilot steel
Print for geometry, soft-mold for material, then cut pilot steel once both are proven.

The four routes

RouteLead timeWhat it proves
SLA / 3D print1–3 daysShape, fit, ergonomics
Vacuum casting3–7 daysSoft material feel, small batch
Rapid silicone sample (soft tool)3–7 daysReal silicone properties
Single-cavity mold7–15 daysThe actual molding process

Which stage are you in?

Early concept → SLA or a hand sample to confirm shape and feel. Design freeze → a rapid silicone sample to confirm the compound, hardness and color. Pre-production → a single-cavity mold to confirm the process and get representative parts for testing. CYES runs all four routes in-house, so you do not lose a week handing off between vendors.