Before mass production, confirm the part against its own drawing, not the material’s datasheet: dimension (against the 2D), hardness, tear and tensile, compression set (for seals), and — for food or medical — the compliance or biocompatibility tests. Run a first-article inspection and a small pilot, and lock the process parameters before the full run.
The pre-production checklist
- First-article inspection (FAI) — every dimension against the drawing.
- Material tests — hardness, tensile, tear, specific gravity.
- Seal tests — compression set and, if needed, leak or rebound.
- Compliance — FDA/LFGB, ROHS/REACH, ISO 10993 as required.
- Pilot run — a small batch through the real process with the full QC plan.
Why test the part, not the material
A datasheet describes the compound, not your geometry. The same material can pass on a test plaque and fail on your part because of a thin section, a weld line or a gate vestige. Testing the actual molded part is the only way to prove the tool and process can make it.
Locking the process
Once the pilot passes, freeze the process parameters — cure time, temperature, shot size, cavity fill — so the production run reproduces the pilot, not a different part.