Short answer

The gate should fill the thin or hard-to-reach section first, keep flow paths short, and land on a non-cosmetic surface where the vestige can be hidden or trimmed. On LSR, the gate is a cold-runner or sub-gate; on HCR compression, material is placed in the cavity so the parting line flash, not a gate vestige, is the concern.

Gate placementFill thin sections first and keep the gate off sealing surfaces.partthin firstthick lastsealing facegate (hidden)Gate off the seal, on a non-cosmetic surface, filling thin first.
Place the gate to fill thin sections first, keep flow short, and keep it off sealing and cosmetic surfaces.

Why the gate decides quality

Silicone cures from the wall inward, so material must reach the farthest feature before it sets. A bad gate starves a thin section or traps air into a weld line; a good gate fills thin-to-thick and lets air vent to the parting line. Gate placement is settled at DFM, before the tool is cut — it is far cheaper to move a gate on a drawing than on steel.

Placement rules

  • Fill thin first, thick last — so the thin feature is not starved.
  • Keep the flow path short — long paths raise pressure and cure risk.
  • Hide the vestige on a non-cosmetic, non-sealing surface.
  • Avoid gating onto a sealing surface — the vestige can become a leak path.

For LSR we usually gate through a cold-runner system that drops the vestige to a small, consistent mark; for compression parts we position the pre-form and plan the parting line so flash, not a gate mark, is the cosmetic concern.