NDA protected
Your design and drawings are covered by an NDA before development starts.
Bring us an idea, a sketch or a reference part. CYES takes it through design, prototyping, in-house tooling and molding — one accountable team from first sketch to first million.
Start an ODM projectYour design and drawings are covered by an NDA before development starts.
The tooling we build for your program belongs to you, with lifetime maintenance under one roof.
A scoped ODM quote and development path returned within 24 hours.
Because design, tooling and production sit in the same factory, each stage feeds the next without re-quoting or re-starting. Here is the path every ODM program follows.
We start from your sketch, reference sample or written requirement and confirm the function, environment, target market and compliance needs before any design work.
Our engineers turn the idea into a manufacturable geometry — draft, parting line, wall thickness and gate layout are reviewed in a design-for-manufacturing pass.
A 3D model is built and revised with you, so fit and function are agreed before tooling is cut.
A fast 3D-printed prototype lets you hold and test the form early, before steel is committed.
A soft / sample mold produces a close-to-final part in 7–15 days, validating shape, function, fit and feel at a fraction of production tooling cost.
Our in-house toolroom cuts the production tool in P20, NAK80 or S136 steel on MAKINO high-speed CNC (±0.008 mm) and Mitsubishi EDM (±0.003 mm), in 15–20 days.
Samples are Pantone-matched under controlled lighting; after you sign off the golden sample, the production run starts with full lot traceability and first-article verification.
Manufacturability review, 3D modeling and 3D-printed prototypes before tooling.
P20 / NAK80 / S136 tools, MAKINO CNC and Mitsubishi EDM, lifetime maintenance.
In-house molding lines scale the validated part from first article to millions.
ISO 13485 quality system, ISO Class 7 cleanroom, FDA / LFGB / RoHS / REACH material compliance.
Go deeper on the detail: the 11-step development process →, how we build molds →, and why in-house tooling matters →.
Every ODM claim on this page links back to documented evidence on this site — process-capability studies, certifications and inspection practice.
A new silicone product typically takes several weeks from concept to production, depending on complexity. The path runs through sketching, CAD modeling, 3D-printed prototypes, a prototype mold, a production mold, sampling and Pantone color matching. We confirm the exact schedule after DFM review; a single-cavity prototype mold takes 7–15 days and a multi-cavity production mold 15–20 days.
It removes broken responsibility. When the mold shop and the molder are different companies, every correction becomes a negotiation and every revision waits for a quote. At CYES, the in-house toolroom builds the molds for our own compression, LSR injection, extrusion and die-cutting lines, so the mold number, drawing revision and material are all verifiable in one place and a cavity change can be cut and re-tried in days.
Before mass production begins, shape, function, color, dimensions and material are all confirmed against the approved sample and specification. Pantone color is matched under controlled lighting by adjusting the pigment masterbatch ratio. Only after the customer signs off on the golden sample does the production run start.
We machine mold cavities to ±0.008 mm on MAKINO 24,000 RPM high-speed CNC, cut fine features and LSR shut-off to ±0.003 mm / ±0.005 mm on Mitsubishi slow-wire EDM to a Ra 0.02 µm mirror finish, and build tools in P20, NAK80 and S136 steel. Finished part dimensions are set per product specification and verified at first article.
Send your sketch, sample or requirement. You'll get a scoped ODM development path and a quote within 24 hours.
Start your ODM project