Short answer

Lead time is counted from final drawing and DFM approval. SLA/DLP prototypes take 1–3 days; rapid samples from existing tooling 3–7 days; a new single-cavity mold 7–15 days; a steel multi-cavity production mold 15–20 days. Medical or complex LSR is confirmed per mold and validation requirements.

Lead times, by stage

StageLead time
SLA / DLP appearance prototype1–3 days
Rapid sample from existing tooling3–7 days
New single-cavity mold sample7–15 days
Steel multi-cavity production mold15–20 days
Medical / complex LSRPer mold & validation requirements

What "counted from approval" really means

The clock starts when the drawing and DFM are signed off — not when you first email us. Unresolved DFM questions, late drawing changes or pending material approvals add time that is not in the number above. The fastest projects are the ones where DFM closes in one round.

Why a realistic lead time protects you

A supplier promising a production mold in "5 days" is usually quoting a soft prototype mold that will degrade in a few hundred shots, not a production steel tool. We quote the real number so your launch date holds. See tooling lead time for the mold-building detail.