1. Drawings or Reference
3D CAD (STEP · IGES · DWG), a 2D drawing, a photo, a physical sample, or even a rough sketch. No drawing? We can work from your idea and reference part.
Talk directly with a manufacturing engineer — send your drawing, sample or idea and get a manufacturing review plus a quote within 24 hours.
Factory-direct pricing — no trading-company markup. Traders commonly add 15–30% over factory price — a market observation, not a CYES-measured saving; your actual saving depends on part, volume and tooling. See our cost breakdown. Free DFM review · engineer quote in 24h · samples in 3–7 days.
US customers: you can contact our Maple Grove, MN sales & support office directly at +1-763-221-0389 or [email protected] for quote coordination, sample hand-off and after-sales support. Manufacturing and factory audits remain in Dongguan, China.
Fill in the fields below — or email us directly. The more detail you share, the faster we return an accurate quote.
A quick reference before you fill the form. Detailed terms are in Purchasing Terms below; any value can be confirmed in writing on the quote.
Values shown are standard ranges; exact figures depend on grade, part geometry and programme. Send your drawing for a confirmed spec.
Send as much of the following as you have — a clear picture of these six items lets our engineers return an accurate, engineer-reviewed quote instead of a placeholder number.
3D CAD (STEP · IGES · DWG), a 2D drawing, a photo, a physical sample, or even a rough sketch. No drawing? We can work from your idea and reference part.
Food-grade, medical-grade or industrial silicone; Shore hardness (20A–80A); color; and any required grade (LSR vs solid silicone, VMQ vs FVMQ).
Which dimensions are critical and what tolerance they must hold — we quote mold accuracy to ±0.008 mm and confirm what is achievable for your part.
Target order quantity and annual forecast. This determines mold strategy (single vs multi-cavity) and unit price. MOQ is quoted as a planning range (not a fixed commitment); typical tiers are 500 / 1,000 / 5,000 pcs.
Where you sell (EU, US, Amazon, medical) and which compliance applies — FDA, LFGB, RoHS, REACH, or ISO 13485 / USP Class VI for medical devices.
If you have an existing part or competitor sample to match, sending it is the fastest way to align hardness, color and finish before tooling begins.
You talk to engineers, not a generic sales funnel — with clear timelines at every step.
We acknowledge your inquiry within 1 hour and flag any obvious feasibility questions immediately.
An engineer — not a form — reviews your CAD and returns a mold cost, price brackets at MOQ 500 / 1,000 / 5,000, and a first-article lead time within one business day. For small runs, our low-MOQ program quotes a project-based MOQ (a planning range, not a fixed commitment).
First-shot samples produced in 3–7 days after mold approval, shipped for your verification.
If a spec has a gap — a wall section that traps air, a radius the tool can't hold — we return two to four engineering questions before quoting, not a guess.
Clear, sourcing-friendly terms for overseas buyers — no hidden clauses, everything stated up front.
| Topic | What we offer |
|---|---|
| MOQ | Flexible — standard orders quoted at 500 / 1,000 / 5,000 tiers; a dedicated low-MOQ program quotes a project-based MOQ (a planning range, not a fixed commitment) |
| Payment terms | 50% deposit + 50% before shipment · Net 30 for established accounts · L/C for orders over USD 50,000 |
| Currencies | USD, EUR, CNY by bank wire |
| Incoterms | FOB (default) · EXW · CIF · DDP on request |
| Sampling | In-stock samples dispatched immediately · custom samples 3–7 days after approval |
| Lead time | Prototype mold 7–15 days · production mold 15–20 days · air 3–5 days · sea 25–35 days |
| Quality assurance | 30-day replacement policy with root-cause corrective-action report |
| Certifications & compliance | ISO 9001 / 13485 · FDA / LFGB / RoHS / REACH · PFAS non-detect |
| Language & support | English-first project engineer, dedicated contact, audit welcome |
| Program | Typical Lead Time |
|---|---|
| Appearance prototype (SLA/DLP) | 1–3 days |
| Simple silicone sample (vacuum cast) | 3–7 days |
| Single-cavity mold sample | 7–15 days |
| Steel multi-cavity production mold | 15–20 days |
Lead times start from final drawing + DFM approval. Free samples are available to evaluate material, hardness and finish before tooling begins. Full detail in the Industrial Procurement FAQ below, or request our Engineering Capability Pack for qualified sourcing.
Answers to the questions engineering and sourcing teams ask most before requesting a quote.