Our 100-piece MOQ is a validation program; volume pricing starts at 500 / 1,000 / 5,000 pieces for hardened production tooling. Sample lead time and production lead time are different numbers — ask for both.
MOQ is a cost-amortization number, not a preference
MOQ depends on which stage you are in. For design validation we run a 100-piece low-MOQ program using soft tooling or consolidated press time, so you can confirm fit and function before committing to steel. For production, 500 / 1,000 / 5,000-piece tiers amortize a P20 hardened-steel mold, a dedicated press cycle and per-batch test reports without a loss. Ask which tier a quote refers to — the number alone does not tell you what tooling and inspection you are getting.
The evidence behind the claim
Sourcing decisions should run on numbers, not sales adjectives. This is the measured record behind our Sourcing & Buying programs — the data you should demand from any supplier.
- Process capability (Cpk): five studies, published — LSR-MED-007 (Cpk 1.24), FVMQ-SEAL-010 (Cpk 1.32), LSR-MED-011 (Cpk 1.27), HTV-GASKET-014 (Cpk 1.34), LSR-MED-018 (Cpk 1.68) — reported against the 1.33 target with sample sizes and test dates on record.
- Certifications: ISO 9001 (61120Q012) and ISO 13485 (04724Q10000602), numbers and scope published — originals under NDA.
- Mold & cavity accuracy: ±0.008 mm CNC, ±0.005 mm LSR shut-off / gate, ±0.003 mm mirror-EDM.
- Material compliance: CTI-tested against FDA 21 CFR 177.2600, LFGB §30/31, RoHS and REACH, per batch.
- Cleanroom: ISO Class 7 (ISO 14644-1:2015, report CR-2026-0714) for any run that touches skin or food.
See the full engineering evidence page →
What to watch for when you source
Lead time has several stages: appearance prototypes in 1–3 days, functional samples in 3–7 days, single-cavity mold samples in 7–15 days, and steel multi-cavity production molds in 15–20 days (medical / complex LSR per mold and validation). We state each stage up front and tie them to the tooling and post-cure steps we actually run. A quote that hides the stage-by-stage split is hiding something.
| Specification | Typical / range |
|---|---|
| MOQ | from 100 pcs (validation); 500 / 1,000 / 5,000 price tiers |
| Sample lead time | 3–7 days (appearance prototypes 1–3 days) |
| Single-cavity mold sample | 7–15 days |
| Production mold | 15–20 days (steel multi-cavity) |
| Why MOQ varies | Stage: validation tooling vs hardened production mold |
| Low-MOQ program | 100 pcs for fit / function validation |