EVT · Engineering Validation
Did we build it right? The first article is measured against the drawing to confirm the mold produces parts to specification.
A three-phase validation framework that de-risks silicone product development — from first-article engineering checks, through functional design validation, to process capability proof before mass production.
EVT, DVT and PVT answer three different questions, so problems are caught at the cheapest possible stage — not discovered in the field.
Did we build it right? The first article is measured against the drawing to confirm the mold produces parts to specification.
Did we build the right thing? The part is tested in its actual use — function, reliability and compliance — to confirm the design works.
Can we build it consistently? A pilot run proves the production process is capable and repeatable before ramp-up.
EVT confirms the tooling and process produce a part that meets the engineering specification. This is the first-article gate — nothing ships to you until the first article passes.
| Item | Detail |
|---|---|
| Engineering inputs | Signed drawing / CAD, DFM report, mold design, material specification |
| Test items | First-shot mold trial; first-article dimensional measurement; Shore A hardness; visual, flash and fill review; weight or shot-size check |
| Acceptance criteria | First article meets drawing tolerances; no short-shot, flash, sink or demolding defects; hardness within range |
| Customer approval node | FAI report issued and reviewed before any sample ships |
| Deliverable | First Article Inspection (FAI) report |
DVT confirms the part works in its real application. This is where function, reliability and regulatory compliance are proven before the design is frozen.
| Item | Detail |
|---|---|
| Engineering inputs | Approved EVT samples, design specification, customer test plan (where provided), regulatory requirements |
| Test items | Functional testing; reliability and life testing; regulatory compliance verification (food-contact, medical, RoHS, REACH); material verification and migration testing |
| Acceptance criteria | Part meets functional and reliability requirements in use; material complies with the applicable standard |
| Customer approval node | Golden sample approved and design frozen before volume tooling |
| Deliverable | Design validation report, material compliance results, golden-sample sign-off |
PVT confirms the production process can hold the specification consistently. A pilot run at production intent generates the capability and measurement data that justify mass production.
| Item | Detail |
|---|---|
| Engineering inputs | Frozen design, production tooling, pilot-run plan, control plan draft |
| Test items | Pilot production run; process capability study (Cpk); measurement systems analysis (Gage R&R); yield and cycle-time review |
| Acceptance criteria | Pilot run meets agreed Cpk and yield targets; the gage, not just the process, is proven capable |
| Customer approval node | Pilot results reviewed and production process released for ramp |
| Deliverable | Process capability report (Cpk), Gage R&R study, control plan, PFMEA |
First-article inspection is standard — the first part from every new or revised mold is measured against the drawing before release.
Critical dimensions carry a documented capability study. Example: a medical LSR diaphragm verified at Cpk 1.24 (study LSR-MED-007).
Calibrated measurement systems are assessed for repeatability and reproducibility before acceptance decisions depend on them.
See the full six-phase framework in our manufacturing process, and the document set in PPAP & quality documentation.
Tell us your product and target market — we'll recommend the validation depth your program needs.
Discuss Your Validation Plan