1-Hour Initial Assessment
We acknowledge your inquiry within 1 hour and flag any obvious feasibility questions immediately.
Send your drawing, sample details or early product idea. We will review the manufacturing route, open questions and next steps before quotation.
You talk to engineers, not a generic sales funnel — with clear timelines at every step.
We acknowledge your inquiry within 1 hour and flag any obvious feasibility questions immediately.
An engineer — not a form — reviews your CAD and returns a mold cost, price brackets at MOQ 500 / 1,000 / 5,000, and a first-article lead time within one business day. For small runs, our low-MOQ program starts at 100 pieces.
First-shot samples produced in 3–7 days after mold approval, shipped for your verification.
If a spec has a gap — a wall section that traps air, a radius the tool can't hold — we return two to four engineering questions before quoting, not a guess.
Clear, sourcing-friendly terms for overseas buyers — no hidden clauses, everything stated up front.
| Topic | What we offer |
|---|---|
| MOQ | Flexible — standard orders quoted at 500 / 1,000 / 5,000 tiers; a dedicated low-MOQ program starts at 100 pieces |
| Payment terms | 50% deposit + 50% before shipment · Net 30 for established accounts · L/C for orders over USD 50,000 |
| Currencies | USD, EUR, CNY by bank wire |
| Incoterms | FOB (default) · EXW · CIF · DDP on request |
| Sampling | In-stock samples dispatched immediately · custom samples 3–7 days after approval |
| Lead time | Prototype mold 7–15 days · production mold 15–30 days · air 3–5 days · sea 25–35 days |
| Quality assurance | 30-day replacement policy with root-cause corrective-action report |
| Certifications | ISO 9001 / 14001 / 45001 / 13485 · SEDEX SMETA · BSCI · PFAS non-detect · FDA / LFGB / RoHS / REACH |
| Language & support | English-first project engineer, dedicated contact, audit welcome |
Full detail in the Industrial Procurement FAQ below, or request our Engineering Capability Pack for qualified sourcing.
Complete the required fields, then choose email or WhatsApp. The more detail you provide, the faster we can identify material, tooling and production questions. If you have a CAD file (STEP · IGES · DWG), mention it — our engineers read it directly against mold cavity budget, target durometer, compliance stack and volume tier.
Auditing us first? Request our Engineering Capability Pack — ISO 9001, ISO 14001, ISO 45001 and ISO 13485 certificates, SEDEX SMETA / BSCI report, PFAS screening reports, cleanroom report, equipment list, material reports, tooling tolerance and QC flow, released for qualified sourcing.
Answers to the questions engineering and sourcing teams ask most before requesting a quote.